SaraNextGen.Com

A surface water treatment plant operates round the clock with a flow rate of $35 \mathrm{~m} / \mathrm{min}$. The water temperature is $15^{\circ} \mathrm{C}$ and jar testing indicated an alum dosage of $25 \mathrm{mg} / 1$ with flocculation at a $G t$ value of $4 \times 10^{4}$ producing optimal results. The alum quantity required for 30 days (in $\mathrm{kg}$ ) of operation of the plant is



Question ID - 156444 | SaraNextGen Top Answer

A surface water treatment plant operates round the clock with a flow rate of $35 \mathrm{~m} / \mathrm{min}$. The water temperature is $15^{\circ} \mathrm{C}$ and jar testing indicated an alum dosage of $25 \mathrm{mg} / 1$ with flocculation at a $G t$ value of $4 \times 10^{4}$ producing optimal results. The alum quantity required for 30 days (in $\mathrm{kg}$ ) of operation of the plant is

1 Answer
127 votes
Answer Key / Explanation : (37800-37800) -

37800-37800

127 votes


127