SaraNextGen.Com

A bucket full of water weighs 5 kg, it is pulled from a well 20 m deep. There is a small hole in the bucket through which water leaks at a constant rate of  .The total work done in pulling the bucket up from the well in J is (



Question ID - 50788 | SaraNextGen Top Answer

A bucket full of water weighs 5 kg, it is pulled from a well 20 m deep. There is a small hole in the bucket through which water leaks at a constant rate of  .The total work done in pulling the bucket up from the well in J is (

1 Answer
127 votes
Answer Key / Explanation : (600) -

The weight of bucket when it has  been pulled up a distance (5-0.2

Hence, the required work is

J

127 votes


127