In above question, the work done in the two wires is |
|||||||
a) |
0.5 J, 0.03 J |
b) |
0.25 J, 0 J |
c) |
0.03 J, 0.25 J |
d) |
0 J, 0 J |
In above question, the work done in the two wires is |
|||||||
a) |
0.5 J, 0.03 J |
b) |
0.25 J, 0 J |
c) |
0.03 J, 0.25 J |
d) |
0 J, 0 J |
(a) are constants. …….(i) Now , Again , ………..(ii) Answer is confirmed by comparing Eqs. (i) and (ii) . |